Detached headquarters/warehouse facility situated on a self-contained, fully secure site.
Van loading dock.
Steel portal frame construction.
Constructed in 1997 and extended in 2000.
10.5m eaves height.
7 dock level loading doors and 3 ground level loading doors.
Canopy over loading areas.
Parking for 290 cars.
Heating, lighting and sprinklers throughout.
Quality fully fitted offices.
Purpose-built call centre.
Security entrance with gate lodge.
Fully fitted canteen and locker facilities.
Raised floors to the offices and call centre.
Comfort cooling/air conditioning to the offices and call centre.
Floor loading capacity 50kn.